33 kV outdoor switchgear erection and commissioning at a state distribution substation.

PROJECT SPECIFICATIONS
VOLTAGE
33 kV
TYPE
Outdoor switchgear
SCOPE
Erection · Testing · Commissioning
STATUS
COMMISSIONED

Scope of work

What we executed.

  • Equipment foundation and structure erection
  • Switchgear installation and busbar coupling
  • CT/PT and lightning arrestor installation
  • Pre-commissioning HV and IR tests
  • Charging and SAT

Execution notes

From site, in plain terms.

Standard MSEDCL configuration; commissioning completed within planned outage.

From site

Photo gallery.

Outcome

Equipment energized and integrated into substation operations.

Related case studies

More from this sector.

18.4088°N · 76.5604°ELATUR · MAHARASHTRA

33/11 kV Substation — Latur

MSEDCL · Power · 2023

18.2877°N · 74.0084°EPURANDAR · MAHARASHTRA

6.3 MVA Power Transformer — Purandar

MSEDCL · Power · 2024

18.4088°N · 76.5604°ELATUR · MAHARASHTRA

33 kV UG Cable 300 sq.mm — Latur

MSEDCL · Power · 2022

Speak to our team.

Tender evaluation, vendor enquiry or a site visit — we respond within one working day.