Railway Traction SP / SSP / TSS — Hyderabad

Design, supply, installation, testing and commissioning of traction substation equipment for Indian Railways electrification.

17.3850°N · 78.4867°EHYDERABAD · TELANGANA
RAILWAY TRACTION SP/SSP/TSS
SCOPE
SP · SSP · TSS — D-S-I-T-C
VOLTAGE
25 kV AC traction
CLIENT
Indian Railways
LOCATION
Hyderabad Division
PROJECT SPECIFICATIONS
SCOPE
SP · SSP · TSS — D-S-I-T-C
VOLTAGE
25 kV AC traction
CLIENT
Indian Railways
LOCATION
Hyderabad Division
STATUS
COMMISSIONED

Scope of work

What we executed.

  • Equipment supply per Railway approved vendor list
  • Erection of Sectioning Posts, Sub-Sectioning Posts and Traction Substation
  • Cable routing, termination and earthing per RDSO specification
  • Pre-commissioning insulation and earth tests
  • Joint commissioning with TRD wing
  • Handover documentation and DLP support

Execution notes

From site, in plain terms.

Site coordination across multiple section blocks required tight planning with traction power controllers.

All materials inspected at vendor works per RDSO QAP before dispatch.

Commissioning executed in pre-approved block window with zero penalty.

From site

Photo gallery.

Outcome

Three posts energized and handed over to TRD Hyderabad. Repeat enquiry received for adjacent section.

Related case studies

More from this sector.

22.3039°N · 70.8022°ERAJKOT · GUJARAT

Railway Traction SP / SSP — Rajkot

Indian Railways · Railway · 2024

Speak to our team.

Tender evaluation, vendor enquiry or a site visit — we respond within one working day.