11 kV UG Cable Network — Latur

Underground 11 kV XLPE cable network — supply, laying, jointing and termination.

PROJECT SPECIFICATIONS
VOLTAGE
11 kV
ROUTE LENGTH
On file
JOINTS
Heat-shrink
STATUS
COMMISSIONED

Scope of work

What we executed.

  • Route trenching, sand bedding and protective tile laying
  • Cable drum handling and pulling
  • Joints and terminations
  • HV and IR testing pre-energization
  • Restoration of trench and surface

Execution notes

From site, in plain terms.

First major UG cable project for YSD — established the field method used in subsequent cable works.

From site

Photo gallery.

Outcome

Network energized; established YSD's cable laying credentials with MSEDCL.

Related case studies

More from this sector.

18.4088°N · 76.5604°ELATUR · MAHARASHTRA

33/11 kV Substation — Latur

MSEDCL · Power · 2023

18.2877°N · 74.0084°EPURANDAR · MAHARASHTRA

6.3 MVA Power Transformer — Purandar

MSEDCL · Power · 2024

18.4088°N · 76.5604°ELATUR · MAHARASHTRA

33 kV UG Cable 300 sq.mm — Latur

MSEDCL · Power · 2022