Site progress

18.4088°N · 76.5604°E
LATUR · MAHARASHTRA
Commissioning
PROJECT SPECIFICATIONS
VOLTAGE
11 kV
ROUTE LENGTH
On file
JOINTS
Heat-shrink
STATUS
COMMISSIONED
Scope of work
What we executed.
- Route trenching, sand bedding and protective tile laying
- Cable drum handling and pulling
- Joints and terminations
- HV and IR testing pre-energization
- Restoration of trench and surface
Execution notes
From site, in plain terms.
First major UG cable project for YSD — established the field method used in subsequent cable works.
From site
Photo gallery.

18.4088°N · 76.5604°E
LATUR · MAHARASHTRA
11 kV UG Cable Network · Frame 1

18.4088°N · 76.5604°E
LATUR · MAHARASHTRA
11 kV UG Cable Network · Frame 2

18.4088°N · 76.5604°E
LATUR · MAHARASHTRA
11 kV UG Cable Network · Frame 3

18.4088°N · 76.5604°E
LATUR · MAHARASHTRA
11 kV UG Cable Network · Frame 4

18.4088°N · 76.5604°E
LATUR · MAHARASHTRA
11 kV UG Cable Network · Frame 5

18.4088°N · 76.5604°E
LATUR · MAHARASHTRA
11 kV UG Cable Network · Frame 6
Outcome
Network energized; established YSD's cable laying credentials with MSEDCL.
Related case studies
More from this sector.

18.4088°N · 76.5604°E
LATUR · MAHARASHTRA
33/11 kV Substation
18.4088°N · 76.5604°ELATUR · MAHARASHTRA
33/11 kV Substation — Latur
MSEDCL · Power · 2023

18.2877°N · 74.0084°E
PURANDAR · MAHARASHTRA
6.3 MVA Power Transformer
18.2877°N · 74.0084°EPURANDAR · MAHARASHTRA
6.3 MVA Power Transformer — Purandar
MSEDCL · Power · 2024

18.4088°N · 76.5604°E
LATUR · MAHARASHTRA
33 kV UG Cable 300 sq.mm
18.4088°N · 76.5604°ELATUR · MAHARASHTRA
33 kV UG Cable 300 sq.mm — Latur
MSEDCL · Power · 2022
Speak to our team.
Tender evaluation, vendor enquiry or a site visit — we respond within one working day.