CASE STUDY · POWER
33/11 kV Substation — Latur
Complete 33/11 kV outdoor substation — power transformer, switchgear, protection and control panels, commissioned to MSEDCL specification.




Scope of work
What we executed.
- Civil work — control room, equipment foundations, cable trenches
- Power transformer erection and oil filtration
- 33 kV and 11 kV outdoor switchgear installation
- CT/PT, lightning arrestor and isolator commissioning
- Control, relay and protection panel wiring and testing
- Earthing grid installation and resistance measurement
- SAT with MSEDCL and energization handover
Execution notes
From site, in plain terms.
Coordinated with MSEDCL field staff for outage planning and feeder synchronization. Civil interface managed in parallel with electrical erection to compress schedule.
Pre-commissioning tests included transformer winding resistance, magnetic balance, vector group, oil BDV, IR and HV tests on switchgear, and primary injection on CTs.
Final SAT documented to MSEDCL format. Handover included as-built drawings, test certificates and DLP support agreement.

From site
Photo gallery.








Outcome
Substation energized on schedule, no defects in DLP period. Asset added to MSEDCL Latur sub-division.
Related case studies
More from this sector.

6.3 MVA Power Transformer — Purandar
MSEDCL · Power · 2024

33 kV UG Cable 300 sq.mm — Latur
MSEDCL · Power · 2022

11 kV UG Cable Network — Latur
MSEDCL · Power · 2020
Speak to our team.
Tender evaluation, vendor enquiry or a site visit — we respond within one working day.