Supply and laying of 33 kV underground XLPE cable network with terminations and joints.

PROJECT SPECIFICATIONS
VOLTAGE
33 kV
CABLE SIZE
3C × 300 sq.mm XLPE
JOINTS
Heat-shrink straight-through
TERMINATIONS
Outdoor heat-shrink
STATUS
COMMISSIONED

Scope of work

What we executed.

  • Route survey, trenching and sand bedding
  • Cable pulling with calibrated tension limits
  • Straight-through joints and outdoor terminations
  • Insulation, HV and sheath tests pre-energization
  • Cable route marker installation and as-built records

Execution notes

From site, in plain terms.

Joints made in dry tent conditions per cable maker's procedure.

All terminations tested with 5 kV motorised insulation tester before charging.

From site

Photo gallery.

Outcome

Cable network energized and handed over to MSEDCL Latur sub-division.

Related case studies

More from this sector.

18.4088°N · 76.5604°ELATUR · MAHARASHTRA

33/11 kV Substation — Latur

MSEDCL · Power · 2023

18.2877°N · 74.0084°EPURANDAR · MAHARASHTRA

6.3 MVA Power Transformer — Purandar

MSEDCL · Power · 2024

18.4088°N · 76.5604°ELATUR · MAHARASHTRA

11 kV UG Cable Network — Latur

MSEDCL · Power · 2020

Speak to our team.

Tender evaluation, vendor enquiry or a site visit — we respond within one working day.